Location
Barcelona.
Project
To improve passenger safety whilst on the station platform, avoiding accidental falls onto the lower tracks and to increase the effective capacity of the platform.

Introductory propositions
Adjustment of the PSD doors to two types of trains, with different centre areas and accesses. Minimize communication equipment between train and landing. Installation of equipments and visual signposting to aid the train when stopping. Maintain the running of trains during the installation of the platform screen doors.
Manusa solution
PSD anodized aluminium PSD doors with interior fixation, including sliding leaves, fixed leaves, swing doors to access the train cabin and swing doors to access the lower track area.